Tube and Clamp scaffolding

Tube and Clamp Scaffolding
For Finishing and Repair Works
Finishing works need easy demountable metalware that enable setting scaffolding lift at a certain height. Presented scaffoldings meet these demands and are designed for finishing and repair works inside and outside of dwelling, public, and production buildings at a height up to 40 meters.
- Boards can be set with a height span of 0.5 m.
- The scaffolding screw jacks used in our constructions make it possible to compensate relief roughness.
- Presented scaffoldings can be successfully used for construction, painting, glazing, wiring works, faceworks, sanitaryware works, plastering, etc.
- Scaffoldings can be erected in any room regardless of doorway size.
- Assembling and relocation of scaffold ling can be easily performed by two persons.
- Scaffolding are assembled from separate interchangeable elements that can be ordered apart from the whole set.
Base Case Specifications
| Height, m | 7.50 |
| Length, m | 3.40 |
| Board width, m | 0.70 |
| Nominal board loading, kgs/m2 | 200.00 |
| Maximum weight, kg | 255.00 |
| Vertical elevation area of set along the wall, m2 | 25.50 |
Base Case Elements
| 1 | Scaffolding Truss 3.40 m | 2 items |
| 2 | Supporting Truss 3.40 m | 4 items |
| 3 | Ladder 2.50 m | 6 items |
| 4 | Board Support | 2 items |
| 5 | Vertical Frame | 2 items |
| 6 | Scaffolding Screw Jack | 4 items |
| 7 | Small Scaffolding Screw Jack | 2 items |